The $47,000 Problem Most Iowa Contractors Don't Even Know They Have
Jake Morrison runs a successful general contracting company in West Des Moines. Last year, his company completed $2.1 million in commercial and residential projects throughout the Des Moines metro area. His books showed healthy profit margins. His clients were happy. His crews stayed busy year-round.
But Jake had a persistent cash flow problem that kept him awake at night.
Despite completing projects on time and under budget, he constantly struggled to make payroll in the slower winter months. He relied heavily on a business line of credit that seemed to grow every year. And worst of all, he couldn't understand why—on paper, his business was thriving.
The culprit? Retention holdbacks were quietly strangling his cash flow, and his generic accountant had never explained how to manage them strategically.
When Jake finally came to Performance Financial for a Tax Reduction Analysis, we discovered he had over $187,000 trapped in retention across nine different projects—money he'd already earned, taxes he'd already paid on, but cash he couldn't touch for months or even years.
This isn't Jake's fault. It's a systemic problem affecting contractors across Ankeny, Johnston, Grimes, Clive, and throughout Polk County. Generic accountants treat retention as a simple accounts receivable line item, completely missing the devastating cash flow implications and strategic opportunities for managing it properly.
What Your Generic Accountant Doesn't Understand About Retention Holdbacks
Here's what most small business accountants will tell you about retention: "It's just money the client holds back until the project is done. You'll get it eventually. It's on your balance sheet as an asset."
That's technically correct and practically useless.
What they won't tell you—because they don't work with enough construction contractors to know—is that retention holdbacks create a cascading series of financial challenges that generic accounting completely fails to address:
The Five Hidden Costs of Retention Your Accountant Isn't Tracking
1. The Tax Trap: You Pay Taxes on Money You Haven't Received
When you use percentage of completion revenue recognition (which most contractors over $10 million are required to use, and which is often advantageous for smaller contractors too), you recognize revenue—and therefore owe taxes on—the full contract value as work progresses.
But your client is holding back 10% of every progress payment.
So you're paying income taxes, self-employment taxes, and potentially S-Corp distributions based on income you literally don't have in your bank account yet.
For a contractor in a 35% effective tax bracket completing $2 million in work annually with 10% retention, that's $70,000 in tax liability on $200,000 you haven't collected yet.
2. The Working Capital Death Spiral
Every new project you start requires upfront capital: materials to purchase, labor to pay, equipment to maintain, subcontractors to fund. But 10% of the money from your previous projects is still locked away in retention.
This creates a widening gap where you need more working capital for new projects while an increasing portion of your earned income remains inaccessible. The faster you grow, the worse this problem becomes.
3. The Interest Cost Nobody Calculates
When cash is trapped in retention, contractors typically cover the shortfall through:
- Business lines of credit (current average: 8-11% interest)
- Credit card float (15-22% interest)
- Delayed vendor payments (costing 2-3% in lost early payment discounts)
- Delayed subcontractor payments (damaging relationships and future pricing)
For a contractor with $200,000 in retention using a line of credit at 9%, that's $18,000 annually in unnecessary interest expense—money that's coming directly out of your profit margin because your accounting system doesn't properly manage retention timing.
4. The Bonding Capacity Impact
Surety companies analyze your working capital when determining bonding capacity. Excessive retention receivables—especially aged retention over 90 days—signal cash flow problems and limit your ability to bond larger projects.
We've seen contractors denied bonding for $500,000+ projects because their balance sheet showed $150,000 in aged retention that their accountant never properly managed or explained to the surety.
5. The Opportunity Cost of Trapped Capital
That $187,000 Jake had trapped in retention? If properly managed and accessible, it could have:
- Funded a second crew, generating an additional $600,000 in annual revenue
- Purchased equipment for cash, saving $12,000 annually in financing costs
- Provided negotiating leverage with suppliers for 2-3% bulk discounts
- Created a cash reserve eliminating the need for expensive short-term borrowing
Your generic accountant sees retention as a line on your balance sheet. A construction-specialized accounting firm like Performance Financial sees it as strategic capital management that directly impacts your ability to grow profitably.
Why Traditional "Solutions" Don't Work (And What Actually Does)
Every contractor we meet has been given the same generic advice about managing retention:
Bad Advice #1: "Just Wait It Out—You'll Get Paid Eventually"
This is the accounting equivalent of "just deal with it." Yes, you'll eventually collect retention (assuming the project closes without disputes, the client remains solvent, final inspections pass smoothly, warranty periods expire, and the client promptly processes final payment).
But "eventually" doesn't pay your current suppliers. It doesn't make this month's payroll. It doesn't fund next quarter's material purchases for new projects. And it certainly doesn't help you grow.
The Real Problem: This advice ignores that construction businesses require continuous working capital. Waiting 6-18 months to collect retention while simultaneously starting new projects creates an exponentially growing cash gap.
Bad Advice #2: "Factor Your Receivables"
Some accountants suggest using factoring companies that will advance you 80-90% of your receivables (including retention) immediately in exchange for a fee.
Here's the math they don't show you: Factoring retention typically costs 2-5% of the face value, plus additional fees for aged invoices. On $200,000 in retention, that's $4,000-$10,000 in fees just to access money you've already earned.
The Real Problem: Factoring is expensive emergency medicine, not a strategic system for managing retention. It's treating the symptom (cash shortfall) rather than solving the underlying problem (poor retention accounting and project cash flow management).
Bad Advice #3: "Negotiate Projects Without Retention"
In theory, this solves everything. In practice, it's nearly impossible for most contractors. Commercial projects, government contracts, and most large-scale work include retention as non-negotiable contract terms. For many Des Moines contractors, 60-80% of available work includes mandatory retention holdbacks.
The Real Problem: This advice essentially tells you to walk away from the majority of available projects in your market. Not exactly a growth strategy.
The Performance Financial Retention Management System: How We Solve This for Des Moines Contractors
At Performance Financial, we've developed a comprehensive retention management approach specifically for Iowa contractors that addresses all five hidden costs simultaneously. Here's how it works:
Component #1: Retention-Aware Tax Planning
The Strategy: We structure your tax strategy around the reality that 10% of your revenue is delayed, ensuring you have adequate cash to meet tax obligations despite retention holdbacks.
How We Implement This:
Quarterly Tax Planning Sessions where we:
- Calculate exact retention amounts trapped at quarter-end
- Adjust estimated tax payments to align with actual cash collected (not just accrual income)
- Time Section 179 depreciation and equipment purchases to offset retention-heavy quarters
- Structure S-Corp salary vs. distribution ratios to maintain cash flow during high-retention periods
Retention-Specific Tax Reserves where we:
- Establish separate savings accounts for tax liabilities on uncollected retention
- Calculate the exact tax burden on retention amounts by project
- Create systematic transfer protocols moving funds to tax reserves as retention accrues
- Prevent the "surprise tax bill" problem when retention is finally collected months later
Entity Structure Optimization where we:
- Analyze whether cash basis accounting (for contractors under $30M) allows deferring taxes until retention collection
- Evaluate completed contract method for long-term projects to better align tax timing with cash flow
- Structure multi-entity approaches that separate high-retention work from quick-turn projects
Real Example: We worked with a Grimes-based electrical contractor completing $3.2M annually with 8% average retention. His previous accountant had him paying quarterly estimated taxes based on accrual income, creating a $32,000 cash shortfall in Q4 when retention peaked. We restructured his tax planning around retention timing, moved him from percentage of completion to completed contract method for longer projects, and adjusted his S-Corp salary ratio. Result: $28,000 improved Q4 cash position without reducing tax compliance or increasing tax liability.
Component #2: Project-Level Retention Tracking & Forecasting
The Strategy: Most contractors track retention as a single line item on their balance sheet. We track it by project, by age, by anticipated release date, and integrate it into a 13-week cash flow forecast.
How We Implement This:
Project-Specific Retention Schedules where we:
- Create a dedicated retention tracking sheet for every project
- Record retention percentage, amount held, expected release conditions, and anticipated collection date
- Flag projects with unusual retention terms (15% instead of standard 10%, extended warranty holdbacks, etc.)
- Calculate weighted average retention timing across your entire portfolio
Aged Retention Analysis where we:
- Categorize retention by age: Current (0-30 days), Standard (31-90 days), Concerning (91-180 days), Problem (180+ days)
- Create automatic alerts when retention ages beyond expected collection dates
- Identify which clients or project types consistently create retention collection delays
- Develop specific collection strategies for aged retention before it becomes uncollectible
13-Week Rolling Cash Flow Forecast where we:
- Integrate expected retention releases into weekly cash projections
- Model different scenarios: on-time release, 30-day delay, 60-day delay
- Identify specific weeks when cash shortfalls will occur
- Plan material purchases, equipment acquisitions, and hiring around anticipated retention releases
Client Retention Pattern Analysis where we:
- Track actual retention release timing by client across multiple projects
- Identify which clients consistently release retention promptly vs. those who delay
- Factor client-specific retention history into project profitability analysis and bidding decisions
- Adjust payment terms or margin requirements for clients with poor retention release history
Real Example: A West Des Moines general contractor was consistently surprised by cash shortfalls despite "knowing" retention was coming. We implemented our retention tracking system and discovered that while their contracts specified 30-day retention release after final completion, actual average was 67 days—and one client averaged 94 days. We built this reality into their cash forecast, adjusted their line of credit timing, and worked with the slow-paying client to implement a 50% retention release at substantial completion + 50% at final. Result: $43,000 improved average cash position and elimination of surprise cash crunches.
Component #3: Strategic Working Capital Management
The Strategy: Rather than treating retention as "missing money," we proactively structure working capital to accommodate retention timing, minimizing expensive short-term borrowing.
How We Implement This:
Retention Reserve Account where we:
- Establish a separate savings account specifically for retention-related cash needs
- During cash-positive periods (winter for many contractors), systematically build retention reserves
- Calculate optimal reserve levels based on your retention portfolio and project pipeline
- Create protocols for when and how to access retention reserves vs. lines of credit
Line of Credit Optimization where we:
- Right-size your line of credit based on actual retention patterns (not just "what the bank will give us")
- Negotiate specific covenants and draw schedules aligned with retention release timing
- Structure lines specifically for retention coverage vs. general operating capital
- Develop paydown protocols that automatically reduce line balance when retention is collected
Vendor Payment Strategy where we:
- Identify suppliers offering early payment discounts (typically 2% for payment within 10 days)
- Calculate whether using line of credit to capture supplier discounts is more cost-effective than waiting for retention
- Negotiate extended terms with key suppliers during retention-heavy periods
- Build vendor relationships that accommodate retention-driven payment timing
Client Billing Optimization where we:
- Structure progress billing schedules that front-load earlier payments (legally and ethically)
- Implement billing on the 1st and 16th of each month rather than monthly (improving cash flow timing)
- Reduce billing cycle time from invoice generation to submission (many contractors lose 7-14 days here)
- Create systematic follow-up processes that accelerate payment of non-retention portions
Real Example: An Ankeny-based plumbing contractor with $1.8M annual revenue was paying $14,200 annually in line of credit interest primarily to bridge retention timing gaps. We implemented a retention reserve account, restructured his supplier payments to capture 2% early pay discounts, and optimized his line of credit usage. Result: $9,100 annual interest savings plus an additional $7,200 in captured supplier discounts—total $16,300 improvement from managing retention strategically.
Component #4: Contract Negotiation & Retention Terms
The Strategy: While you can't eliminate retention, you often can negotiate more favorable terms that dramatically improve cash flow—if you know what to ask for and how to frame it.
How We Implement This:
Retention Term Analysis where we:
- Review your standard contracts and identify retention-related terms that cost you money
- Compare your terms against industry standards for your specific trade and region
- Identify specific language that creates collection delays or disputes
- Develop contractor-favorable alternative language that remains acceptable to clients
Graduated Retention Release Structures where we negotiate:
- 50% retention release at substantial completion + 50% at final (vs. 100% at final)
- Partial retention release for completed project phases on multi-phase projects
- Early retention release in exchange for warranty bond or letter of credit
- Reduced retention percentage (7% or 8%) in exchange for payment security instruments
Retention Cap Negotiations where we seek:
- Maximum retention dollar amounts ($50,000 cap) rather than unlimited percentages
- Retention holdback only until a certain project percentage (10% retention until 75% complete, then none)
- Different retention rates for different project components (lower retention on materials, higher on labor)
- Contractor-favorable dispute resolution language that doesn't indefinitely delay retention release
Client Education Approach where we:
- Help you explain to clients how retention delays impact your costs (and therefore their pricing)
- Provide templates showing how early retention release creates win-win scenarios
- Develop relationships with client financial teams who understand cash flow challenges
- Position favorable retention terms as competitive advantages you offer versus other contractors
Real Example: A Johnston-based remodeling contractor doing high-end residential work had standard contracts with 10% retention released 30 days after final completion. We helped him develop language for 5% retention at substantial completion, 5% at final completion, with a $25,000 maximum retention cap per project. On a $380,000 project, this released $19,000 four months earlier than his previous terms, and the cap meant larger projects didn't create proportionally larger cash flow gaps.
Component #5: Bonding & Banking Relationship Management
The Strategy: Properly presenting retention in your financial statements and explaining your retention management system dramatically improves bonding capacity and banking relationships.
How We Implement This:
Surety-Ready Financial Statements where we:
- Present retention as a separate, clearly identified current asset (not buried in A/R)
- Provide aging analysis showing retention is being collected within normal timelines
- Include management discussion explaining your retention management protocols
- Demonstrate systematic tracking and collection of retention (not "hoping it shows up")
Bonding Capacity Analysis where we:
- Calculate how retention levels impact your bonding formula and availability
- Identify specific thresholds where reduced retention would increase bonding capacity
- Develop strategies to accelerate retention collection on older projects before seeking new bonding
- Present retention data in ways that minimize bonding underwriter concerns
Banking Relationship Enhancement where we:
- Provide lenders with retention forecasts showing predictable collection timing
- Demonstrate systematic processes that make retention collection reliable (not unpredictable)
- Negotiate line of credit terms specifically structured around retention timing
- Position your business as sophisticated and systematized (not chaotic and reactive)
Alternative Financing Exploration where we:
- Analyze when retention financing makes sense vs. traditional lines of credit
- Evaluate construction-specific lenders who understand retention timing
- Investigate SBA programs that may provide more favorable terms for retention-related working capital
- Structure equipment financing to align with retention release schedules
Real Example: A Clive-based commercial contractor needed $500,000 bonding capacity for a municipal project but was initially declined. His balance sheet showed $168,000 in accounts receivable with no retention breakout, concerning the surety. We restructured his financial statements to clearly show $127,000 was retention with documented 45-day average collection after project close, demonstrated systematic tracking, and showed his actual operating receivables were only $41,000 with 28-day average collection. Surety approved the bond. Six months later, we helped him increase bonding capacity to $850,000 using the same retention management documentation.
The Retention Management Implementation Roadmap
If you're a Des Moines-area contractor currently struggling with cash flow despite healthy profit margins, here's exactly how to implement strategic retention management:
Month 1: Assessment & Systems Setup
Week 1-2: Current State Analysis
- List every open project with retention amounts held
- Calculate total retention currently trapped
- Identify oldest retention amounts and initiate collection efforts
- Review all active contracts for retention terms and conditions
Week 3-4: System Implementation
- Set up project-specific retention tracking (we provide templates for Performance Financial clients)
- Establish retention reserve account at your bank
- Create 13-week cash flow forecast including retention release projections
- Review and optimize current line of credit structure with your banker
Month 2-3: Proactive Management
Contract Term Optimization
- Review standard contracts and identify opportunities for improved retention terms
- Develop language for graduated retention release structures
- Create client communication templates explaining mutual benefits
- Begin implementing improved terms on new projects
Tax Planning Integration
- Calculate tax liability on currently uncollected retention
- Establish tax reserve protocols for future retention
- Evaluate entity structure and accounting method optimization
- Implement quarterly retention-aware tax planning reviews
Month 4-6: Continuous Improvement
Performance Tracking
- Monitor actual vs. projected retention release timing
- Identify clients with consistent retention delays
- Refine cash flow forecasting based on real collection patterns
- Adjust working capital strategies based on seasonal retention patterns
Strategic Leverage
- Use improved cash position to negotiate supplier discounts
- Evaluate growth opportunities now possible with better cash access
- Consider bringing in-house work previously subcontracted
- Explore larger projects previously inaccessible due to cash constraints
Real Numbers: What Retention Management Is Actually Worth
Let's return to Jake Morrison, the West Des Moines contractor from the beginning of this article. Here's exactly what happened when we implemented comprehensive retention management:
Before Performance Financial:
- $187,000 trapped in retention across 9 projects
- $14,700 annual line of credit interest
- $8,400 in lost supplier early-payment discounts
- Stress-driven decision making around cash flow
- Growth limited by working capital constraints
- Two delayed projects due to material purchase timing
After 12 Months with Performance Financial:
- Average retention balance reduced to $121,000 (better collection + graduated release terms)
- $8,200 annual line of credit interest ($6,500 savings)
- $6,100 captured in supplier early-payment discounts ($14,500 swing)
- Retention reserve account funded with $35,000
- Took on 3 additional projects due to improved cash position
- Increased bonding capacity from $350,000 to $625,000
Total First-Year Financial Impact: $47,300
And perhaps more importantly: Jake stopped waking up at 3 AM worried about making payroll. His wife noticed he was less stressed. His crews got paid consistently and on-time, improving retention. His suppliers viewed him as reliable, leading to better pricing and terms.
This is what construction-specialized accounting creates. This is what generic accountants miss entirely.
Why Des Moines Contractors Need Construction-Specialized Accounting
Your brother-in-law's accountant is probably great at preparing tax returns for insurance agents and retail stores. They might even be adequate at basic bookkeeping for your construction company.
But they fundamentally cannot provide what you need because they don't understand the unique financial challenges of construction businesses.
They don't track retention at the project level because they've never seen how it strangles contractor cash flow. They don't integrate retention timing into tax planning because their other clients don't have retention. They don't know how to present retention to sureties because they've never worked with bonded contractors. They don't negotiate contract terms because they've never seen how small changes create massive cash flow improvements.
Construction businesses require construction-specialized accounting. It's not optional. It's the difference between surviving and thriving.
The Performance Financial Difference for Iowa Contractors
Performance Financial CPA, Accounting & Tax serves construction contractors throughout Des Moines, Ankeny, West Des Moines, Johnston, Grimes, Clive, Waukee, and across the Midwest. We specialize exclusively in contractors, builders, and construction trades—it's literally all we do.
When you work with us, you get:
✅ Construction-Specific Expertise We understand job costing, progress billing, retention management, percentage of completion accounting, WIP schedules, and every other unique aspect of construction accounting. Your financial statements will actually help you make better decisions rather than just satisfying the IRS.
✅ Proactive Tax Planning We don't wait until April 15th to tell you what you owe. We work with you quarterly to implement strategic tax reduction strategies specifically for contractors, including equipment depreciation optimization, retirement plan strategies, entity structure planning, and timing strategies that can save you $15,000-$50,000+ annually.
✅ Strategic Cash Flow Management We build 13-week rolling cash flow forecasts that integrate retention timing, progress billing schedules, equipment purchases, tax payments, and seasonal fluctuations. You'll always know exactly where your cash position stands and what's coming.
✅ Job Costing That Actually Works We implement and maintain job costing systems that tell you which jobs, which project managers, which clients, and which types of work are actually profitable—not just which ones are busy.
✅ Growth-Focused Financial Strategy We help you develop the financial systems, reports, and relationships you need to scale your business, increase bonding capacity, improve banking relationships, and eventually create a valuable business you can sell.
✅ Year-Round Support We don't disappear after tax season. We're here year-round providing bookkeeping services, answering questions, advising on major decisions, and serving as your financial partner.
Take the Next Step: Get Your Free Tax & Accounting Analysis
If you're a contractor in the Des Moines metro area currently working with a generic accountant, you're almost certainly leaving money on the table—possibly tens of thousands of dollars annually.
The retention management strategies in this article are just one component of comprehensive construction accounting. There are dozens of additional opportunities for tax reduction, cash flow improvement, and profitability enhancement that construction-specialized accounting provides.
Book your free Tax & Accounting Analysis today and discover exactly how much money your current accounting approach is costing you. We'll review your last two years of tax returns, analyze your current financial statements, and identify specific opportunities for improvement.
No obligation. No pressure. Just clear information about what's possible when you work with accountants who actually understand construction businesses.
📞 Call us at 515-949-0123
📧 Email: dvanthul@performancefinancialllc.com
Frequently Asked Questions About Retention Holdbacks
Q: Is 10% retention standard across all types of construction projects?
A: While 10% is most common, retention varies significantly by project type, region, and contract structure. Commercial projects often use 10%, but we see government contracts with 5%, residential projects with 5-15%, and some specialty trades with no retention at all. The key is understanding what's standard in your specific market segment and negotiating from there.
Q: Can I refuse to work on projects that include retention?
A: Technically yes, but practically this eliminates 60-80% of available work for most contractors. The better approach is learning to manage retention strategically rather than avoiding it entirely. We've seen contractors successfully negotiate reduced retention or improved terms while remaining competitive.
Q: How long should I expect to wait for retention release after project completion?
A: Contract terms typically specify 30-60 days after final completion, but actual timing varies significantly by client. Our tracking shows average retention release of 45-67 days after final completion for most Des Moines-area contractors, with some clients consistently taking 90+ days. This is why project-specific tracking is essential.
Q: Should I factor my retention receivables to improve cash flow?
A: Factoring can be useful in specific situations (emergency cash needs, one-time growth opportunity) but it's expensive—typically 2-5% of face value plus additional fees. It's better viewed as emergency medicine rather than a systematic solution. The strategies in this article provide more cost-effective long-term solutions.
Q: Will my surety company care about how much retention I have outstanding?
A: Absolutely. Excessive retention, especially aged retention over 90 days, signals potential collection problems and cash flow constraints. This directly impacts bonding capacity. Properly presenting and managing retention in your financial statements significantly improves surety relationships.
Q: My contracts say retention is released 30 days after final completion, but my clients routinely take 90+ days. What can I do?
A: This is extremely common and represents a significant hidden cost. Options include: (1) Systematic follow-up starting at day 15, (2) Contractual language including interest penalties after 30 days, (3) Building actual collection timing into your pricing and cash flow forecasts, (4) Factoring this delay into client selection and pricing decisions for future projects.
Q: Does retention earning interest while being held by the client?
A: This depends entirely on contract language. Most standard construction contracts don't require clients to pay interest on retained amounts, meaning they're essentially receiving a free loan funded by your working capital. Some contractors successfully negotiate interest-bearing retention accounts or early release terms that compensate for the time value of money.
Q: How do I account for retention on my balance sheet?
A: Retention should appear as a separate line item under current assets, clearly labeled as "Retention Receivable" or "Contract Retention Held." This distinction is important for anyone analyzing your financial statements (lenders, sureties, potential buyers) because retention has different collection characteristics than standard accounts receivable.
Q: Can I structure my contracts to eliminate retention but increase my price to compensate?
A: This is theoretically possible but practically difficult for most contractors. Clients who require retention do so to protect against defects, punch list items, and warranty claims. Simply raising your price 10% rarely convinces them to eliminate this protection. More effective approaches include graduated release structures or reduced retention percentages.
Q: What happens to retention if my client goes bankrupt before releasing it?
A: This is a significant risk that underscores why client financial stability matters. In bankruptcy, retention typically becomes an unsecured claim, meaning you may collect only pennies on the dollar or nothing at all. This is why project-specific retention tracking includes client financial monitoring and why we help contractors evaluate client risk before accepting projects.
About Performance Financial CPA, Accounting & Tax
Performance Financial specializes exclusively in accounting, tax planning, and financial strategy for construction contractors throughout Iowa and the Midwest. Founded by Drake Van Thul, CPA, our firm serves electricians, plumbers, HVAC contractors, general contractors, custom home builders, remodelers, and specialty trade contractors from $500,000 to $30,000,000+ in annual revenue.
Unlike generic accounting firms that dabble in construction, we focus exclusively on contractor accounting—it's literally all we do. This specialization means we understand job costing, progress billing, retention management, WIP schedules, percentage of completion accounting, bonding requirements, and every other unique challenge construction businesses face.
We serve contractors throughout Des Moines, Ankeny, West Des Moines, Johnston, Grimes, Clive, Waukee, Pella, and across Iowa, providing year-round bookkeeping, tax preparation, strategic tax planning, S-Corp optimization, cash flow management, and growth-focused financial strategy.